skip to primary navigationskip to content

Department of Physics

The Cavendish Laboratory

Studying at Cambridge

Cavendish III

Preliminary works begin on the Cavendish 3 site

Mar 14, 2018
As part of the verification of technical aspects of the design of Cavendish III, two large concrete slabs have this week been cast on the site of the new building. The area depicted will ultimately form the base of the cycle storage under the raised plaza.